As someone who travels frequently for work, I know the frustration of flight cancellations and delays. The Federal Aviation Administration’s nationwide ground stop on Nov. 13, caused by a telecommunications malfunction involving aging equipment, offered a warning that extends beyond aviation: We cannot afford to wait for critical infrastructure to fail before modernizing it.
America’s electric grid is another system where the stakes are considerably higher.
In August 2003, transmission lines contacting overgrown trees in Ohio, compounded by malfunctioning monitoring software and other operational failures, triggered a massive blackout across eight states and parts of Canada. Approximately 50 million people lost electricity.
The New York subway stopped. Businesses closed. Traffic signals went dark. Millions were left without air conditioning, refrigeration, or reliable communications.
Imagine something similar happening today, when even more of our economy depends on electricity and interconnected technologies.
In my role at the Abundance Institute, conversations with utilities, energy innovators and infrastructure developers reinforce a concerning reality: America’s aging transmission infrastructure faces growing demands that existing systems and regulatory frameworks are struggling to accommodate.
The Energy Department’s 2026 Draft National Transmission Needs Study identifies a pressing need for additional transmission capacity to maintain reliability, accommodate electricity demand, and relieve congestion. Aging equipment and barriers to infrastructure development threaten both reliability and affordability.
But building entirely new transmission lines isn’t our only option. We can get substantially more from the grid we already have.
Think of our electricity network as a highway system. When traffic increases, we don’t always need another interstate. Sometimes we can expand capacity by improving existing lanes and managing traffic more efficiently.
Advanced transmission technologies can accomplish this. Modern conductors can carry substantially more electricity using existing transmission towers. Dynamic line ratings use real-time weather conditions to determine how much electricity lines can safely carry. Advanced power flow controls redirect electricity around congested portions of the grid.
These aren’t futuristic concepts. The DOE’s 2026 Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades initiative has selected projects expected to upgrade more than 1,500 miles of transmission lines and deploy grid-enhancing technologies across nearly 21,000 miles.
Similarly, surplus interconnection service allows additional electricity generation or storage to utilize unused capacity at existing grid connections, subject to reliability reviews.
Of course, America must also build more transmission, including stronger connections between regions. But how we build matters.
Competitive transmission policies can allow qualified developers to compete for projects, while merchant transmission enables privately financed infrastructure without automatically shifting financial risks onto ratepayers.
Congress also has an opportunity through the Bipartisan American Affordability and Jobs Act to improve permitting certainty, streamline federal reviews, and accelerate infrastructure development, including upgrades within existing transmission rights-of-way.
Not every growing electricity need requires another transmission line. Microgrids and bring-your-own-power arrangements can enable businesses to generate electricity locally, accommodating economic growth while reducing pressure on the broader grid.
These solutions share a common objective: increasing capacity, strengthening reliability, and protecting affordability.
Modernization, however, should never become a blank check for utilities. Regulators must ensure investments deliver measurable improvements and meaningful value for consumers.
The 2003 blackout demonstrated how quickly localized problems can become widespread emergencies. The FAA’s recent ground stop reminded us that aging infrastructure remains vulnerable, even as our dependence on it grows.
We have the technology, engineering expertise, and policy solutions to strengthen America’s electric grid.
TRUMP MUST NOT MISTAKE IRAQ’S MILITIA RESHUFFLE FOR IRAN’S RETREAT
America needs more transmission, but it also needs a smarter approach to the transmission it already has.
Waiting for a crisis to force modernization is an expensive and unnecessary gamble. We cannot afford to let America’s electric grid experience its own FAA moment before deciding it’s time to act.
Ryan Norris is a senior fellow for energy policy at the Abundance Institute.