Preservationists ask court to block Trump from painting historic Eisenhower building

.

Preservationists filed a motion on Thursday asking a federal judge to block the Trump administration from painting the historic Eisenhower Executive Office Building in Washington.

Cultural Heritage Partners filed a renewed motion for a preliminary injunction to stop the administration from testing samples of white paint on the Eisenhower Executive Office Building, which sits next to the White House. The motion asked U.S. District Judge Dabney Friedrich to halt paint testing as a legal battle plays out over whether the White House improperly assumed control of the project from the General Services Administration, the federal agency charged with oversight over the building. Friedrich was nominated by Trump and is a judge for the U.S. District Court for the District of Columbia.

“The issue has never been whether the building should be studied,” the filing reads. “The issue is whether the White House can conduct that testing—and ultimately alter one of America’s most important historic buildings—without following the process Congress established to protect historic places and ensure the public has a voice.”

The lawsuit comes as Trump has faced a number of other legal challenges threatening a range of renovation projects, from the White House East Wing ballroom and the Kennedy Center to the Lincoln Memorial Reflecting Pool.

The plaintiffs in the latest lawsuit include Cultural Heritage Partners, firm founders Greg Werkheiser and Marion Werkheiser, and the DC Preservation League.

The White House has claimed routine grime, including soot and bird droppings accumulated over roughly 20 years, has so weakened the granite structure that painting it is the only way to save it, according to Cultural Heritage Partners. The preservationist group has not identified a paint that would avoid harming the building.

TRUMP SAYS $200 MILLION KENNEDY CENTER ‘MAINTENANCE’ WON’T MEAN ‘RIPPING IT DOWN’

The Trump administration said on July 20 that it plans to test paint a small portion of the building with white mineral silicate paint and cut out sections of stone for off-site study, as it examines options for saving the structure. That work could begin by Monday, unless the court intervenes.

The Washington Examiner reached out to the White House for comment.

Related Content